South Carolina General Assembly
121st Session, 2015-2016

Download This Bill in Microsoft Word format

Indicates Matter Stricken
Indicates New Matter

H. 3357

STATUS INFORMATION

General Bill
Sponsors: Rep. Hart
Document Path: l:\council\bills\agm\18489ab15.docx

Introduced in the House on January 20, 2015
Currently residing in the House Committee on Labor, Commerce and Industry

Summary: Electric utility companies

HISTORY OF LEGISLATIVE ACTIONS

     Date      Body   Action Description with journal page number
-------------------------------------------------------------------------------
   1/20/2015  House   Introduced and read first time (House Journal-page 17)
   1/20/2015  House   Referred to Committee on Labor, Commerce and Industry 
                        (House Journal-page 17)

View the latest legislative information at the website

VERSIONS OF THIS BILL

1/20/2015

(Text matches printed bills. Document has been reformatted to meet World Wide Web specifications.)

A BILL

TO AMEND THE CODE OF LAWS OF SOUTH CAROLINA, 1976, BY ADDING SECTION 58-27-25 SO AS TO PROVIDE AN ELECTRICAL UTILITY OPERATING IN THIS STATE SHALL BURY ALL OF ITS NEW ELECTRICAL POWER TRANSMISSION LINES INSTALLED WITHIN THE BOUNDARIES OF A MUNICIPALITY IN THIS STATE AFTER JANUARY 2, 2016, AND SHALL BURY ALL OF ITS EXISTING ELECTRICAL POWER TRANSMISSION LINES LOCATED WITHIN THE BOUNDARIES OF A MUNICIPALITY IN THIS STATE ACCORDING TO A GRADUATED SCHEDULE BEFORE JANUARY 1, 2023; AND TO AMEND SECTION 58-27-20, RELATING TO AREAS TO WHICH THE CHAPTER IS INAPPLICABLE, SO AS TO MAKE THE CHAPTER APPLICABLE TO SECTION 58-27-25.

Be it enacted by the General Assembly of the State of South Carolina:

SECTION    1.    Article 1, Chapter 27, Title 58 of the 1976 Code is amended by adding:

"Section 58-27-25.    (A)    An electrical utility operating in this State shall bury:

(1)    all of its new electrical power transmission lines installed within the boundaries of a municipality in this State beginning January 2, 2016;

(2)    all of its existing electrical power transmission lines located within the boundaries of a municipality before January 1, 2023, as follows:

(a)    at least twenty-five percent of the lines must be buried before January 1, 2017;

(b)    at least fifty percent of the lines must be buried before January 1, 2019;

(c)    at least seventy-five percent of the lines must be buried before January 1, 2021; and

(d)    one hundred percent of the lines must be buried before January 1, 2023.

(B)    This section applies to all electrical utilities, including electrical utilities otherwise exempted from the provisions of this chapter."

SECTION    2.    Section 58-27-20 of the 1976 Code is amended to read:

"Section 58-27-20.    The provisions of this chapter, except for Section 58-27-25, shall not apply to the areas within former municipal corporate limits, where such this municipality becomes a part of a consolidated political subdivision whenever such when this municipality owns and operates its own electric system and so long as such this system continues to be owned and operated by the consolidated political subdivision."

SECTION    3.    This act takes effect upon approval by the Governor.

----XX----

This web page was last updated on January 22, 2015 at 1:48 PM